• Plastics Scaffold Sheeting for Construction Protection
  • Plastics Scaffold Sheeting for Construction Protection
  • Plastics Scaffold Sheeting for Construction Protection
  • Plastics Scaffold Sheeting for Construction Protection
  • Plastics Scaffold Sheeting for Construction Protection
  • Plastics Scaffold Sheeting for Construction Protection

Plastics Scaffold Sheeting for Construction Protection

Material: PE
Applications: Architectural Textiles
Type: Tarpaulin
Style: PE Coated
Pattern: Plain
Width: 57/58"
Samples:
US$ 1/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2014

Suppliers with verified business licenses

Manufacturer/Factory, Group Corporation
  • Overview
  • Product Description
Overview

Basic Info.

Model NO.
scaffold sheeting
Gram Weight
20-260GSM
Structure
Fabric Form
Size
2X45m
Transport Package
Each Piece Packed in PE Poly Bag with One Label in
Specification
3.3x36m
Trademark
Winco
Origin
Hebei
HS Code
3926909090
Production Capacity
5000tons/Month

Product Description

Product Description

 


Scaffold sheeting is used for weather protection and containment applications. Reinforced polyethylene edges with eyelets. Scaffold sundries and sheeting.

Scaffold Sheeting
- Weight range: 70gsm-300gsm (3x3mesh)
- Roll length: 1m-2m
- Natural color or with the color requested
- Both Sides laminated
Plastics Scaffold Sheeting for Construction Protection
 
products: 100%  HDPE  Yarn  Warp  Knitting  Fabric  Both  Side  LDPE  Coated  and  MB  Waterproof  Fabric,   Lumber  Truck  Tarp,   Coil  Tarpaulin,   Custom  Truck  Cover, Insulated  Tarp,   Mesh  Tarp, Leno Tarp    Drop  Cloth,   Debris  Netting,   PVC  Fabric  Rolls,   PVC  Tarpaulin,   PP  Woven  Bag, Tarpaulin  Accessories(Ball  Bungee,   Toggle  Tie) 
Material: 100%  HDPE    Fabric+LDPE  Coating
Color Blue, White, Green, Black, Orange, Yellow  and  so  on(  AS  Your  Requirement)
Weight 55GSM  ~  400GSM  (  AS  Your  Requirement)
Density  /  sq.   Inch 6x6  to  14x14  (  AS  Your  Requirement)
Length No  limitation  (  AS  Your  Requirement)
Package Packing  in  rolls    (  AS  Your  Requirement)
Delivery  Time 30  days  after  order  confirmation
Trade  terms:   FOB  Qingdao,   CFR,   CIF 
Note:   If  the  quality  is  the  same,   our  price  is  more  competitive. 
If  the  price  is  the  same,   our  quality  is  better.
Plastics Scaffold Sheeting for Construction Protection

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2014

Suppliers with verified business licenses

Manufacturer/Factory, Group Corporation
Registered Capital
5000000 RMB
Plant Area
>2000 square meters